2X35 MW KASHAGAN NATURAL GAS FIRED SIMPLE CYCLE POWER PLANT

2X35 MW KASHAGAN NATURAL GAS FIRED SIMPLE CYCLE POWER PLANT

projectdetail

Construction Period: 37 months (September 2009 - November 2012) Project Description: Scope of work includes design, procurement, construction and commissioning of the 2x35 MW Natural Gas Fired Simple Cycle Power Plant. General Contractor: «Gate Insaat Taahhut Sanayi ve Ticaret A.S.» JSC The Power Plant will provide electrical power to be used by the onshore processing facility. The equipments are mainly: 2 GE 6B Gas Turbines, 3 Essential Diesel Generators, Power Generation Building, Essential Diesel Generator Building, Step up Transformers, 35/10/0,7/0,4 kV Switchgears and DCS.

  • Shares:
2X35 MW KASHAGAN NATURAL GAS FIRED SIMPLE CYCLE POWER PLANT

description

238 MW KASHAGAN COMBINED CYCLE POWER PLANT

Construction Period: 30 months (May 2005 - November 2007)

Project Description: Execution of all civil works, steel structure, mechanical, electrical erection, piping, instrumentation, painting and insulation works of 238 MW natural gas fired combined cycle power plant composed of 4x42 MW gas turbines and 2x35 MW steam turbines for the power supply for Trench 1 and 2 of Kashagan Petroleum Area.
General Contractor: «Bateman Kazakhstan Oil & Gas Company BV.»
Scope of work:

Civil works:
Backfill: 40.000 m3
Concreting: 9.000 m3
Roads: 12.250 m2

Structural steel erection:
2.900 ton

Equipment erection:
Gas Turbines: 340 ton
Gas Turbine Generators: 288 ton
Gas Turbine Gearboxes: 80 ton
Steam Turbines: 194 ton
Steam Turbine Generators: 150 ton
Air coolers: 170 ton
Overhead Cranes: 45 ton
Stacks: 185 ton
Balance of Plant: 1.000 ton
Total: 2.500 ton

Piping;
Pipe and Fittings: 600 ton
Pipe Supports: 40 ton

Electrical erection:
Cabling: 216.000 m
Cable Trays: 52.000 m 
Power Transformers: 23 each
Switchyard, Transformer Station, Control Center

Instrumentation:
1.500 each instrument installation
SS Tubing: 2.000 m