ATYRAU Refinery Reconstruction Project

ATYRAU Refinery Reconstruction Project


  • Shares:
ATYRAU Refinery Reconstruction Project


Construction Period 23 months (January 2004 - November 2005)

Project Description: Construction of additional units (gasoline, diesel, sulfur, hydrogen, coker) and renovation works for the Atyrau Refinery. 
General Contractor: JGC – Japonya
Scope of Work: Following works were performed by GATE as subcontractor to JGC:

Civil construction works:
Structural Concrete: 7.000 m3
Paving Area: 21.000 m2
Buildings: 1.195 m2
Floor Heating Area: 1.500 m2 
Structural steel works:
Fabrication and erection: 1.700 ton
Cladding (Roofing & Siding): 7.000 m2

Mechanical works:
Equipment erection: 2.800 ton (Drum, Reactor, Vessel, Tank, Exchangers, Air Fin Coolers)
Furnace: 5 set
Rotary Equipments: 113 set (Pumps, Compressor, Blower & Fan)

Prefabrication and Field Welding: 292.000 ID
Post Weld Heat Treatment and Radiographic Inspection
Electric and instrumentation works:
Local Instrument & Panel Installation: 986 set
Conduit Pipe Installation: 16.658 m
Instrumentation cable: 150.000 m
Power and Control Cable: 243.000 m
Insulation, painting and fire proofing;
Equipment Insulation: 5.000 m2
Piping Insulation:160.000 I.M.
Painting: 97.500 m2
Pipe Wrapping: 1.000 m2
Fire Proofing by concreting: 1.270 m2