KASHAGAN MAIN WORKS TRANCHE 1, 2, 3 PROJECT

KASHAGAN MAIN WORKS TRANCHE 1, 2, 3 PROJECT

projectdetail

Construction Period: 39 months (April 2005 - June 2008) Project Description: The project is construction of main pipe rack, oil process units and gas compression unit for Tranche 1 and 2 of petroleum process facility located 35 km northeast of Karabatan region, Atyrau, Republic of Kazakhstan. Scope of project is; supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works.

  • Shares:
KASHAGAN MAIN WORKS TRANCHE 1, 2, 3 PROJECT

description

General Contractor: «North Caspian Contractors B.V. (NCC)»
Scope of Work:

Civil works:
Excavation: 214.000 m3
Back Filling: 140.000 m3
Concreting: 77.340 m3 (structural), 34.721 m3 (paving)
Road: 17.452 m2 asphalt

Structural steel erection works;
Steel Erection: 13.244 ton 

Building construction works;
Transformer Station: 4.560 m2(8 ea)
Control Building:4.185 m2(3 ea)
Compressor Station: 4.985 m2(3 ea)

Equipment erection works;
389 ea different size equipment

Piping works;
23.986 ton (357.000 m)
965.235 WDI welding

Painting works;
Structural Steel: 388.643 m2
Piping: 225.774 m2

Insulation works;
Equipment: 6.531 m2
Piping: 78.561 m2

KASHAGAN MAIN WORKSTRANCHE 3

Construction Period: 18 months (April 2009 – July 2011)

Project Description:
The project is construction of Main Pipe Rack for Tranche 3, Oil Processing Unit for Tranche 3 and Gas Compression Unit 361 of Petroleum Process Facility located 35 km northeast of Karabatan region, Atyrau, Republic of Kazakhstan. Scope of project is; supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, electrical and instrumentation works, painting and insulation works.
General Contractor: «North Caspian Contractors B.V. (NCC)»
Scope of Work:
Civil works:
Concreting: 2.337 m3 (structural), 14.972 м3 (paving)
Roads: 8.263 m2 asphalt

Structural steel erection works;
Steel Erection: 2.916 ton

Equipment erection works;
99 ea different size equipment

Piping works;
169.290 WDI welding

Painting works;
Structural Steel: 72.734 m2
Piping: 18.411 m2

Insulation works;
Equipment: 2,899 m2
Piping: 9.915 m2