Picture of 2X35 MW KASHAGAN NATURAL GAS FIRED SIMPLE CYCLE POWER PLANT

Construction Period: 37 months (September 2009 - November 2012) Project Description: Scope of work includes design, procurement, construction and commissioning of the 2x35 MW Natural Gas Fired Simple Cycle Power Plant. General Contractor: «Gate Insaat Taahhut Sanayi ve Ticaret A.S.» JSC The Power Plant will provide electrical power to be used by the onshore processing facility. The equipments are mainly: 2 GE 6B Gas Turbines, 3 Essential Diesel Generators, Power Generation Building, Essential Diesel Generator Building, Step up Transformers, 35/10/0,7/0,4 kV Switchgears and DCS.

View More »
Picture of ATYRAU Refinery Reconstruction Project
Maden Projeleri,Petrol Projeleri

ATYRAU Refinery Reconstruction Project

View More »
Picture of KASHAGAN INDUSTRIAL BUILDINGS
Santral Projeleri

KASHAGAN INDUSTRIAL BUILDINGS

The project is construction of industrial buildings of petroleum process facility located 35 km northeast of Karabatan region, Atyrau, Republic of Kazakhstan. Scope of project is; fire station building, center control room, laboratory, mechanical workshop, electrical and instrumentation workshop, warehouse (2 ea), temporary refuges (2 ea), gate house and change room.

View More »
Picture of KASHAGAN MAIN WORKS TRANCHE 1, 2, 3 PROJECT

Construction Period: 39 months (April 2005 - June 2008) Project Description: The project is construction of main pipe rack, oil process units and gas compression unit for Tranche 1 and 2 of petroleum process facility located 35 km northeast of Karabatan region, Atyrau, Republic of Kazakhstan. Scope of project is; supply of all civil works materials, paint, insulation, support and all consumables, execution of civil works, construction of industrial buildings, fabrication and erection of steel structures, prefabrication of piping spools and installation, installation of equipment, painting and insulation works.

View More »
Picture of TEMPORARY CONSTRUCTION OFFICES, TENGIZ

Construction Period: 12 months (November 2014 - November 2015) Project Description: The project is construction of Temporary offices upon the Future Growth Project (TCO). Scope of project is: mechanical works, procurement, building commissioning.

View More »